NASA Logo - John F. Kennedy Space Center
+ Expendable Launch Vehicle Home Page
Expendable Launch Vehicle Schedule
KSC HOME SITE SEARCH MULTIMEDIA FAQ/CONTACT US NASA CENTERS
  + NASA Home
   
  ELV Missons
   
AURA Studying the chemistry of our planet's atmosphere EOS A constellation of Earth-observing satellites
MISSION HOME
LAUNCH PAD
PROCESSING FLOW
FIRING ROOM
MISSION ARCHIVE
VIRTUAL LAUNCH CONTROL CENTER
WHAT DOES IT MEAN?
NASA DIRECT!


  NASA FACT
 


The seating assignments in the Firing Room change according to the launch vehicle. For example, the seating arrangement for a launch using a Delta II launch vehicle may be different from the seating arrangement for a launch using a Delta II Heavy or a Pegasus launch vehicle.


NASA's Aura satellite is designed to study the ozone, air quality, and climate of our planet

DIRECT FROM LAUNCH CONTROL

Aura Firing Room

The launch team will assemble at their computers and communication consoles in the launch control center at Vandenberg Air Force Base (VAFB) about 3 to 4 hours before the Aura launch.

The NASA launch manager (NLM) will be the highest authority during the launch of the mission and will provide NASA's "Go / No-Go" decision to the Mission Director.

Before launch, the NLM will check with the launch team to make sure all the launch criteria are being met and that the Boeing Delta II vehicle and payload are ready to go.

Chuck Dovale, NASA Launch Manager
Chuck Dovale

NASA Launch Manager (NLM)
The NLM is responsible for ensuring that the countdown and launch decision processes are properly conducted. He requires "Go/ No-Go" concurrence from the following elements: NCE, MIM, SMA, SHIA, SMD and NAM. He then provides NASA's "Go/ No-Go" for Launch to the Boeing Mission Director (BMD). The NLM serves as the NASA Launch Director.

James Wood, NASA Chief Engineer
James Wood
NASA Chief Engineer (NCE)
The NASA engineering team leader, the NCE is responsible for advising the NLM of the launch vehicle's engineering and analysis status and the Go/No Go for launch. He receives the status and assessment from the KSC Engineering Team and provides a "Go/ No-Go" to the NLM.
Dave Breedlove, Mission Integration Manager
Dave Breedlove
Mission Integration Manager (MIM)
Assessment of launch service and observatory readiness. The MIM receives information from the Mission Director on issues pertaining to overall health, status of operational network and/or progress of countdown operations. The MIM is the primary interface between the spacecraft and the launch vehicle.
Gary Hendricks, Safety And Mission Assurance Manager
Gary Hendricks
Safety & Mission Assurance Manager (SMA)
Quality and safety assessment of the countdown operations and overall launch decision process. The SMA Manager is responsible for monitoring NASA flight assurance requirements during the launch countdown process and ensuring the countdown is conducted according to proper procedures.
Bert Garrido, Safety, Health and Independent Assessment Manager
Bert Garrido
Safety, Health & Independent Assessment Manager (SHIA)
Independent assessment of the countdown operations and overall launch decision process. The SHIA Manager is responsible for providing an independent assessment of the countdown operations and overall launch decision process. This includes assessment of the operation in order to evaluate whether the proper safety and health guidelines are followed.
John Loiacono, Spacecraft Mission Director
John Loiacono
Spacecraft Mission Director (SMD)
Overall assessment of Aura readiness. The SMD is responsible for the Aura and its readiness for launch. The SMD will receive status and recommendations from the Aura launch support team. He provides the spacecraft "Go/ No-Go" to the NLM.
Joe Lackovich, NASA advisory manager
Joe Lackovich
NASA Advisory Manager (NAM)
Consultation and assessment of the launch process and countdown (advisory only). The NAM leads a team composed of NASA personnel who are experienced in launch operations. The Advisory Team provides an assessment of the launch countdown and launch team performance, and assures that the launch decision process is properly executed.

 

FIRST GOV   NASA Home Page Curator: Lynda Warnock
NASA Official: Dennis Armstrong
Last Updated: July 12, 2004
 